Friends of Eva Knepper Project List 2008
Apr 7, 2008
Author: Alicia

Eva Knepper Projects: (see map)
Trail Board Requests for Public Works:
The following requests
1. Level the bridge and place a handrail (see map for location)
2. Consult with County and improve the trail access at Cemetery Road, may require fill.
3. At the bridge fix the exposed mat—requires: trail widening, level trail, insert a retaining wall, and gravel/sand
4. Gravel/sand and fix slide slope (see map for location)
5. Place a handrail at Commanche trailhead or re-design
6. Place a handrail at Delaware trailhead or re-design
7. Add gravel on berm of irrigation ditch, this will prevent erosion and identify trail.
8. Consult with ditch company: fix current trash grate on culvert or consider adding a railing.
9. Add two (2) culverts (see map).

Materials Requested:
Handrails:
Culverts:

Friends of Eva Knepper have offered to volunteer time and labor for the projects listed.